Triumf Cooling Tower

TRiuMf Cooling ToweR

We hired to work along with the Triumf mechanical and electrical engineering team to change out one of there cooling towers the use for their parton accelerator. One of our major challenges was to run over 400 feet of conduit from the 2nd floor basement, through risers, through a outdoor enclosed bulk head, around a building, and underground to the cooling tower control panel. We were able to complete this project in a timely fashion and within budget.

OUR TEAM.

Quinn

McLaughlin

John

Galloway

Doug

Gillis

Remy

St-Cyr

Darren

Keeler

Jared

Brown